Subfloor Prep & Floor Leveling
The floor you see is only as good as the floor underneath. Uneven slabs cause lippage, cracked tile, hollow spots and planks that separate. Gold Ladder flattens and repairs the base so your new floor goes down right and stays that way.
01 /
Why Prep Matters
Large-format tile and click-together plank flooring have tight flatness requirements. A slab that looks fine to the eye can have dips and humps that show up as uneven edges, rocking tiles or gaps. Proper prep is the difference between a floor that lasts and one that needs repairs.
02 /
What Prep Includes
- 01
Flatness check across the entire floor
- 02
Grinding high spots and old adhesive
- 03
Patching cracks and low areas
- 04
Self-leveling underlayment for larger areas that need to be brought level
- 05
Crack isolation membranes to keep slab movement from cracking tile
- 06
Moisture testing before wood and some LVP installations
03 /
Slab vs. Wood Subfloors
Most South Florida homes and condos are built on concrete. For the upper floors of some homes with wood framing, we check for deflection and add backer board or underlayment as required for tile.